Gridman performed following:
- protection and coordination study for 110 kV main substation,
- protection and coordination for 22kV and 6kV internal electrical network.
Gridman performed following:
- plant modelling in DigSilent PowerFactory,
- performing the grid code studies (Fault ride through, Active power step change, LFSM-O, Reactive Power capability),
- building and validating the plant EMT model in PSCAD.
Seabank, United Kingdom
Steam/Gas turbine modelling
Installed power: 910 MW
Project partner: Siemens Energy
Gridman performed following:
- development of the steam/gas turbine dynamic models in DigSilent PowerFactory/PSCAD,
- validation grid compliance studies against the grid (SMIB model),
- simulation tests on IEEE 9-bus system.
Plymouth BESS, United Kingdom
Grid code compliance and design studies
Installed power: 20 MW
Project partner: Pulse Clean Energy
Gridman performed following:
- power plant modelling,
- load flow and short-circuit study,
- G99 grid compliance study,
- P28/P29 voltage unbalance,
- G5/5 harmonic study.